@3q wrote:
First, there are three nodes and two links on the drawing.
Then, I add a node (E) and a link(L3) on the drawing.
For the changes in the drawings(new node E and link L3), highlighted or selected all the changes in the drawings.
I hope to be able to do it, can you give me some suggestions or similar examples?
Posts: 2
Participants: 2